top of page

// Regulated by RICS // NEC4 // Audit-grade records // UK-wide //

Commercial support for civils and infrastructure on the nuclear estate

Chartered quantity surveying and NEC contract administration for contractors delivering civils, enabling and infrastructure works on new build, operating and decommissioning sites.

Peak Commercial we're your team
Peak Commercial Cloud
Peak Commercial Cloud

One of six sectors. Capability tier; the disciplines transfer.

What Peak Commercial does on nuclear civils packages

Peak Commercial provides NEC commercial and quantity surveying support for contractors delivering civils, enabling and infrastructure packages on the UK nuclear estate. The nuclear estate is the most heavily audited construction environment in the country, and the commercial record has to meet the same standard as the engineering one. Every cost, every change and every decision is expected to be traceable, justified and held by people who are suitably qualified and experienced for the role. That is good target cost administration. Applied without exception.

This sector is growing. The Government took its final investment decision on Sizewell C on 22 July 2025, at a capital cost of around £38 billion in 2024 prices, and the project reached financial close on 4 November 2025 as the first nuclear station financed under the regulated asset base model. Alongside new build, the decommissioning and operating estates continue to let civils, enabling and infrastructure packages, and the great majority of that work runs on NEC.

We say plainly where the evidence sits. The directors' delivery record is on highways and water; the disciplines that transfer are NEC4 target cost administration, compensation event assessment, Defined Cost records built for audit, and subcontract procurement. Where a package requires nuclear-specific competence, we say so and work alongside the people who hold it.

What this includes
NEC4 contract administration on civils, enabling and infrastructure packages
Compensation event notification and assessment, including design change and hold points
Defined Cost records built to audit-grade standard from mobilisation
Target cost build-up, forecasting and change control
Subcontract procurement and NEC4 subcontract administration for specialist suppliers
Interim applications, payment notices and final account settlement
Party representation in adjudication and mediation

01

Water

AMP8 frameworks under NEC4 Option C and Option E, administered to survive the water company's commercial assurance and the regulator behind it. The firm is building a commercial team of more than fifteen on one major AMP8 framework.

Water treatment plant

02

Rail

Renewals and enhancements under Control Period 7, with the commercial process built around possessions and access windows. Capability tier; the disciplines transfer.

Railway Construction Worker

03

Aviation

Airfield, terminal and baggage infrastructure works in live airports, priced and recorded to the operational calendar. Capability tier; the disciplines transfer.

04

Highways

Strategic road network and local authority programmes under NEC4 target cost, through the RIS3 road period that began in April 2026. Where the directors learned the trade.

Aerial City Highways

05

Nuclear

Civils, enabling and infrastructure packages on the nuclear estate, with Defined Cost records built to audit grade from mobilisation. Capability tier; the disciplines transfer.

Nuclear power station

06

Commercial schemes

NEC framework appointments for private sector clients, administered order by order: package orders under NEC4 and work packages under NEC3, each priced, recorded and closed as its own contract.

Building construction

// Regulated by RICS // NEC4 // Audit-grade records // UK-wide //

What audit-grade means in practice

The Office for Nuclear Regulation licenses nuclear sites and holds licensees to conditions that reach into how contractors work on them. The licensee passes that discipline to its supply chain through its own quality and assurance arrangements, and a contractor's commercial records are inside that scope. In practice this means the compensation event file, the Defined Cost ledger and the change log have to be complete at the time, signed off by the right people and retrievable years later, when the people who made them may have moved on and the licensee's auditor wants to see why a hold point in a particular week cost what it did.

Design change, hold points and inspection release are the events that generate most commercial movement on nuclear civils. Each is a notifiable event under NEC4 when the contract says it is, and each carries a cost of waiting that is easy to under-record. We build the process so that hold points and inspection delays are logged as they occur, with the shift cost attached, and notified within the contract timescales.

SQEP, suitably qualified and experienced personnel, applies to the commercial team too. On nuclear packages the people signing off the records need to be able to show why they are competent to do so. Peak Commercial's engagements are led by chartered surveyors whose credentials are named on this site and can be checked with the institutions that awarded them.

Container Ship Docked

Who we act for

Main contractors and framework partners delivering civils and infrastructure packages on new build, operating and decommissioning sites. Specialist subcontractors in groundworks, structures, utilities and enabling works under NEC4 subcontracts. Licensees and delivery partners who need an independent commercial review of a package or a disputed account, where we act as party representative.

Talk to a quantity surveyor

Talk to a chartered specialist about your nuclear civils package. Send us the contract, the Scope and the key correspondence. We will tell you where you stand, what it is worth pursuing, and what it is not.

Construction Worker Elevated

Frequently Asked Questions

Frequently asked before appointing us.

bottom of page